Your Whole New Supply Chain 
For Heavy-Duty Parts
You are here: Home » Blog » Top 20 Heavy-Duty Starter Motor Manufacturers in the USA

Top 20 Heavy-Duty Starter Motor Manufacturers in the USA

Views: 0     Author: Site Editor     Publish Time: 2026-02-11      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Why This B2B Wholesale Guide Matters for Importers & Distributors (MOQ, Lead Time, OEM Replacement)

If you're sourcing heavy-duty starter motors for the U.S. market, your success is rarely decided by "brand popularity." It's decided by whether your supplier can support bulk order fulfillment, interchange accuracy, and stable MOQ + lead time—without creating warranty disputes that drain margin.


The 3 issues that drive most wholesale problems

  1. Wrong interchange / wrong fitment
    A large share of B2B returns comes from avoidable mismatches: rotation direction, teeth count, mounting pattern, solenoid position, or connector variation. The procurement fix is simple: quote by OE No. + spec verification.

  2. Unclear stock vs production lead time
    Many suppliers say "available," but that may mean "available to produce." A distributor needs clarity: ready-to-ship stock, production lead time, and shipment schedule.

  3. Warranty workflow is missing
    In wholesale, warranty isn't "yes/no." It's a process: what evidence is needed, what';s the timeline, and how claims are handled. Strong suppliers document this upfront.


Manufacturer vs supplier (what buyers actually need)

Many buyers search "manufacturer," but procurement often needs a supplier that can deliver:

  • MOQ tiers and volume pricing

  • mixed-model consolidation for container shipping

  • export documentation + packaging standards

  • cross reference support (interchange sheets, catalog mapping)


Soft CTA (tool-like, not salesy)
If you're building a shortlist, use this rule:

Start with OE numbers + quantity range + destination port, then ask suppliers to confirm OE-equivalent options, MOQ tiers, and lead time. If you want an additional comparison quote, include Elecdurauto as an OE-equivalent exporter option for bulk orders and distributor programs.


H2 summary (quotable): For B2B wholesale buyers, the "best" supplier is the one that minimizes wrong-fit returns and maximizes reorder stability through MOQ tiers, lead time clarity, and cross-reference support.



Editorial Policy & Verification for B2B Supplier Selection (E-E-A-T, Importer-Focused)

To outperform competing list posts, this guide follows a procurement-first editorial model—designed for importers, wholesalers, and distributors.


Who this guide is for

  • Heavy truck parts wholesalers / distributors

  • Importers building OEM replacement programs

  • Fleet maintenance supply chains that buy in bulk order cycles

  • Buyers needing interchange validation across OE numbers


Who this guide is not for

  • Retail shoppers looking for a single unit shipped today

  • DIY fitment advice for one vehicle (this is B2B wholesale-focused)

How we verify and present supplier info

In the Top 20 section (Part 2), each entry will be formatted with consistent procurement fields (business type, applications, wholesale fit, catalog depth).
When supplier details are unclear or vary by region, the profile will be presented conservatively (e.g., “often offered as reman” vs absolute claims).


Why Elecdurauto is mentioned in a USA-focused guide

Many buyers serving the U.S. market compare USA-based manufacturers with OE-equivalent import supply to meet MOQ, lead time, and stocking needs. Mentioning Elecdurauto is positioned as a procurement alternative for buyers evaluating bulk order programs—so readers can compare sourcing channels efficiently.

H2 summary (quotable): A high-performing B2B list post wins by adding verification logic, consistent procurement fields, and transparent update practices—not by adding more filler.



Copy-Paste RFQ Template for Heavy-Duty Starter Motor Wholesale Buyers (Importer/Distributor Ready)

Use this template to speed up quoting and reduce wrong-fit disputes. It's structured for wholesale procurement, not retail.

RFQ Template (copy-paste)

Subject: RFQ – Heavy-Duty Starter Motor (Wholesale / Bulk Order / OEM Replacement)

Hello,
We are a [importer/wholesaler/distributor] sourcing OEM replacement / OE-equivalent heavy-duty starter motors for [truck / construction / marine / industrial] applications.

Please quote based on the details below:

  1. OE No. / Part No.: [list]

  2. Application: [brand / model / engine / year]

  3. Key specs: Voltage [12V/24V], Power (kW) [ ], Teeth [ ], Rotation [CW/CCW], Mounting [ ], Solenoid position [ ]

  4. Quantity range: [trial 20–50 pcs/model] or [monthly 200+ pcs total]

  5. Incoterms: [EXW/FOB/CIF/DDP]

  6. Destination port / country: [ ]

  7. Target lead time: [ ]

  8. Packaging: neutral / private label / bulk packing / pallet

  9. Documents: invoice, packing list, COO (if needed), test/inspection proof (if available)

Also confirm: MOQ tiers, volume pricing, stock availability, warranty workflow, and cross-reference support.

Best regards,
[Name / Company]


Downloadable assets (add these as internal links)

  • RFQ spreadsheet template (Excel/Google Sheet): “starter-motor-rfq-template”

  • Interchange validation checklist (PDF): “starter-motor-cross-reference-checklist”

  • Distributor quotation format (PDF): “wholesale-quotation-format”



Supplier Evaluation Scorecard for Distributors (Wholesale MOQ, Lead Time, Quality Control)

Most competitor articles list names only. To beat them, include a scorecard buyers can actually use.


Scorecard fields (use as a table in your post)

Category (B2B) What to check Why it matters in wholesale
MOQ tiers per model / per order value / mixed models determines trial feasibility + reorder scale
Lead time clarity stock vs production vs shipping schedule reduces missed delivery promises
Cross reference support interchange sheet, catalog mapping, verification SLA lowers wrong-fit returns
QC & test proof bench test rate, inspection photos, traceability notes reduces claim disputes
Warranty workflow required evidence, timeline, resolution options protects distributor margin
Export packaging inner box, carton strength, pallet rules prevents transit damage
Private label labeling, barcodes, neutral box, artwork rules enables distributor branding
Documentation invoice/PL/COO, HS support speeds customs + reduces errors

How to use the scorecard (simple)

  • Shortlist 8–12 suppliers → request RFQ + scorecard answers

  • Choose 3–4 finalists → trial order by top-moving OE numbers

  • Track return reasons → lock a repeatable reorder process

Elecdurauto placement (natural)
If your distributor program requires OE-equivalent replacement with export packaging and a standardized quote format, you can include Elecdurauto in the same scorecard framework for apples-to-apples comparison.



Key Definitions for B2B Buyers: OEM Replacement, OE-Equivalent Supplier, Reman vs New (Wholesale Focus)

Clear definitions help you compare offers fairly—especially when different suppliers quote different build types.


OEM, OE number, interchange (cross reference)

  • OE number: the original reference used for fitment matching

  • Interchange / cross reference: mapping between equivalent numbers across brands/catalogs
    Best practice for B2B: OE No. → application → spec verification → interchange confirmation.


OE-equivalent (OE replacement) in wholesale purchasing

"OE-equivalent" typically means the product targets OE-level fit/performance for aftermarket replacement. In procurement, verify by:

  • consistent spec sheet structure

  • clear interchange rules

  • defined QC/testing approach (even if summarized)


Remanufactured vs new (what distributors choose)

  • Reman can be cost-competitive but introduces variables (core handling, rebuild standard variability).

  • New often reduces cross-border complexity and dispute risk for export wholesale programs.



B2B Sourcing Checklist for Heavy-Duty Starter Motor Suppliers (MOQ, Stock Availability, Bulk Order Terms)

Use this checklist before you spend time chasing quotes.


Commercial terms (importer/distributor essentials)

  • MOQ & price breaks: per model vs per order value, mixed models allowed?

  • Stock availability: ready-to-ship vs build-to-order

  • Lead time: standard production + shipping timeline

  • Payment terms: confirm what's possible for your order size

  • Warranty terms: evidence needed + claim timeline


Technical verification (return prevention)

Confirm these before you place a bulk order:

  • Voltage (12V/24V), kW/torque class

  • Teeth count

  • Rotation (CW/CCW)

  • Mounting/flange/bolt pattern

  • Solenoid position and connector type


Export packing & documentation

  • anti-rust, internal protection, carton strength

  • pallet rules and container loading guidance

  • invoice/packing list/COO support where needed



Quick Ordering Scenarios for Wholesale Buyers (Emergency Replacement vs Repeat Supply, Distributor Programs)

Most procurement falls into one of these patterns:


Scenario A: Emergency replacement (small qty, time-sensitive)

Priorities: stock + fast shipment. If supplier MOQ is high, you’ll need a backup channel or a pre-agreed program.


Scenario B: Distributor stocking (repeat bulk orders)

Priorities: MOQ tiers, stable lead time, cross reference support, and claim workflow. Start with trial SKUs, then expand to reorder cycles.


Scenario C: Private label / OEM replacement program

Priorities: packaging, labeling, documentation, consistency. This is where an OE-equivalent exporter (e.g., Elecdurauto) can be evaluated as a long-term wholesale supplier option.



Top 20 Heavy-Duty Starter Motor Manufacturers & Suppliers Serving the USA (Wholesale / Bulk Order / Distributor Shortlist)

How to use this shortlist (B2B): This is a "serving the USA market" list—some are US-based brands, some are global OE manufacturers with strong USA distribution/aftermarket presence. Use it to shortlist suppliers for wholesale heavy-duty starter motors, OE cross reference matching, and repeatable batch supply.


1) Elecdurauto — OE-Equivalent Heavy-Duty Starter Motor Supplier (Export / Wholesale)

  • Business Type: Heavy-duty parts manufacturer & exporter (starters, alternators, turbochargers, AC compressors, resistors)

  • Best for (B2B): Importers, distributors, fleet suppliers needing OE-number sourcing + stable batches

  • Why it fits this list: Your starter motor pages are built around OEM reference numbers / OE matching, which is exactly how B2B buyers shortlist and control returns.


2) Delco Remy — Medium & Heavy Duty Starters (HD / Off-Road)

  • Business Type: Heavy-duty starter program

  • Best for: Fleet & off-road distributors

  • Notes: Positioned for HD/off-road conditions and reliability.


3) Prestolite Electric (Leece-Neville) — Heavy Duty Systems

  • Business Type: Starter manufacturer (Prestolite / Leece-Neville brands)

  • Best for: Heavy-duty / extreme-application channels

  • Notes: Emphasizes durable starters for tough environments.


4) WAI Global — Aftermarket Manufacturer (Automotive + Heavy-Duty)

  • Business Type: Manufacturer of starters/alternators across multiple segments

  • Best for: Wholesalers needing broad SKU coverage

  • Notes: Covers heavy-duty, agricultural, marine, industrial.


5) BBB Industries — Sustainable Manufacturing (Starters / Alternators)

  • Business Type: Sustainable manufacturing platform for rotating electrical

  • Best for: Buyers mixing new + reman strategies

  • Notes: Publicly positions itself as a leader in sustainable manufacturing including starters.


6) TERREPOWER (Wilson brand) — New + Reman Starter Programs

  • Business Type: Portfolio platform; Wilson offers starters & alternators

  • Best for: Distributor programs with OE-quality positioning

  • Notes: Wilson provides new and reman starters including heavy-duty applications.


7) Bosch — Remanufactured Starter Motors (Program Supply)

  • Business Type: Reman starter program

  • Best for: Buyers prioritizing test/QA processes and returns control

  • Notes: Bosch highlights reman starter motors built for extremes and factory testing.


8) DENSO Heavy Duty — Medium & Heavy Duty Starters

  • Business Type: OE-quality heavy-duty program

  • Best for: Fleet diesel engine applications

  • Notes: Lists HD starter features like high torque and durability focus.


9) Valeo Service (Trucks) — Truck Starter Coverage

  • Business Type: Truck aftermarket supplier

  • Best for: EU-truck coverage buyers serving the USA market

  • Notes: Mentions coverage for major truck brands and multiple segments.


10) HELLA — Wholesale-Facing Starters & Alternators Range

  • Business Type: Aftermarket supplier focused on automotive wholesalers

  • Best for: Wholesalers wanting program-style supply

  • Notes: HELLA explicitly frames the range "for automotive wholesalers."


11) Hitachi Automotive Systems Americas — Starter Program (Rotating Electrical)

  • Business Type: Aftermarket rotating electrical (starters)

  • Best for: Buyers seeking clear technical feature sets

  • Notes: Official product page lists starter design features.


12) Astemo Americas (Aftermarket) — Starter (STR) Line

  • Business Type: Aftermarket rotating electrical (starter)

  • Best for: Buyers wanting brand-backed replacement programs

  • Notes: Astemo presents its starter product line and role in starting systems.


13) Diamond Gard — Mitsubishi Electric Heavy Duty Starters Program

  • Business Type: Aftermarket HD starter program

  • Best for: HD truck engine coverage buyers

  • Notes: Describes Mitsubishi Electric Heavy Duty availability across HD truck engines.


14) ARCO Marine — USA-Based Marine Starters (Manufacture / Test / Warehouse)

  • Business Type: Marine parts supplier emphasizing USA-based operations

  • Best for: Marine distributors (inboard/outboard starter demand)

  • Notes: States it manufactures, quality-tests, and warehouses in the USA.


15) MAHLE Aftermarket (MAHLE Letrika) — Starter Motors (Multi-Segment)

  • Business Type: Aftermarket supplier (starter motors)

  • Best for: Commercial vehicles + construction/ag machinery channels

  • Notes: MAHLE states starter motors cover passenger, commercial, construction, and agricultural machinery.


16) SEG Automotive — OE Heritage + Aftermarket Supply

  • Business Type: OE manufacturer heritage brought to aftermarket

  • Best for: Distributors wanting OE mindset & scalable coverage

  • Notes: SEG explicitly states its OE heritage and aftermarket positioning.


17) Lucas Automotive — Reconditioned Starters (Wide Coverage)

  • Business Type: Reconditioned program

  • Best for: Value-focused channels; rebuild/reman-friendly buyers

  • Notes: States broad coverage across cars, trucks, marine, agricultural, construction.

18) Caterpillar (Cat) — Genuine Starter Replacement (Equipment)

  • Business Type: Genuine parts ecosystem

  • Best for: CAT equipment channels and service networks

  • Notes: Official support page focuses on genuine Cat starter replacement.


19) Cummins (ReCon / OEM) — Starters for Engine Platforms

  • Business Type: OEM & ReCon program parts

  • Best for: Cummins engine platform supply chains

  • Notes: Cummins shop lists starters; Cummins ReCon describes reman parts positioning.

20) Magneti Marelli Parts & Services — Expanding Starters & Alternators Range

  • Business Type: Independent aftermarket supplier

  • Best for: Buyers needing car + commercial/industrial coverage

  • Notes: States coverage expanding to commercial/industrial/agricultural/earth-moving with OE-spec design.



Comparison Table for Importers & Wholesale Distributors (MOQ / Lead Time / New vs Reman / Cross-Reference)

Supplier / Brand Business Type Strong Segments New vs Reman Best Fit (B2B) Procurement Note
Elecdurauto Manufacturer & exporter HD starters + related HD parts New supply Importers / distributors OE-number matching content is a key fit for B2B sourcing (elecdurauto.com)
Delco Remy HD program Fleet / off-road Program-based Fleet distributors HD/off-road positioning
Prestolite (Leece-Neville) Manufacturer Extreme applications New programs HD systems buyers Tough-environment focus 
WAI Global Manufacturer Auto + HD + ag + marine Mostly new lines SKU-wide wholesalers Broad segment coverage
BBB Industries Sustainable manufacturing Rotating electrical Mix Reman-friendly buyers Sustainable mfg positioning
TERREPOWER / Wilson Portfolio + brand line HD + marine New + reman Program buyers OE-spec claims on starters
Bosch Reman program Multi Reman QA-driven channels Reman testing messaging
DENSO Heavy Duty OE-quality program Fleet diesel New line Fleet distributors HD starter feature set
Valeo Service Aftermarket supplier Trucks Mix Truck-focused buyers Truck coverage statement
HELLA Wholesale-facing Vehicle electrics New programs Wholesalers "For automotive wholesalers"
Hitachi Americas Aftermarket line Rotating electrical Mix Tech spec buyers Feature list on starters
Astemo Americas Aftermarket line Rotating electrical Mix Brand-backed buyers Starter (STR) line
Diamond Gard HD program HD truck engines Mix Engine-platform buyers HD engine availability
ARCO Marine USA-based ops Marine starters New Marine distributors USA manufacture/test/warehouse
MAHLE Letrika Aftermarket supplier CV + off-highway New Multi-segment Multi-market coverage
SEG Automotive OE + aftermarket PC + CV New + reman OE-heritage buyers OE-to-aftermarket positioning
Lucas Automotive Reconditioned Wide Reconditioned Value channels Broad reconditioned coverage
Caterpillar Genuine parts Equipment New Cat ecosystem Genuine replacement focus
Cummins (ReCon/OEM) OEM + reman program Engine platforms ReCon + new Cummins channels ReCon positioning
Magneti Marelli P&S IAM supplier Car + commercial/industrial Mix EU coverage buyers OE-spec + multi-segment coverage



How to Shortlist a Heavy-Duty Starter Motor Supplier for B2B Wholesale (MOQ / Lead Time / Cross Reference / Warranty)

This section is designed for importers, wholesalers, and distributors who need repeatable supply—not one-off purchasing. Use it to turn your "Top 20" list into a real bulk-order supplier shortlist.


Step 1: Build a "high-signal" RFQ batch (the fastest way to compare suppliers)

Pick 10–30 OE numbers that represent your real demand:

  • Top-moving SKUs (fast turnover)

  • High-risk SKUs (most returns historically)

  • Strategic SKUs (new market / fleet program)


Step 2: Require cross-reference confirmation before price discussion

To reduce wrong-fit returns, your suppliers must confirm:

  • OE number → application → key specs (12V/24V, kW, teeth, rotation, mounting)

  • Interchange mapping method (catalog source + verification process)

Procurement rule: If a supplier can't clearly validate interchange/cross reference, don't scale the order—no matter how attractive the unit price is.


Step 3: Compare suppliers using a scoring system (not "feelings")

Use a simple 100-point scorecard:

A) Commercial fit (40 pts)

  • MOQ tiers and mixed-model consolidation

  • Lead time clarity (stock vs production vs shipping schedule)

  • Price breaks for bulk orders and stable pricing rules


B) Quality + returns control (40 pts)

  • QC/testing summary (what gets tested, how often)

  • Warranty workflow (evidence required, timeline, resolution method)

  • Consistency signals (stable BOM, stable suppliers, consistent packaging)


C) Export readiness (20 pts)

  • Export packaging standard (anti-rust, foam protection, carton strength)

  • Labeling / barcode / neutral packing / private label options

  • Documentation readiness (invoice/packing list/COO where needed)


Step 4: Run a "two-stage trial order" before scaling

Stage A (trial): small batch by key SKUs to validate fitment + damage rate
Stage B (repeat): reorder the same SKUs to validate consistency (this is where many suppliers fail)


Step 5: Lock a reorder process (so you can scale without chaos)

Define:

  • Approved OE list and interchange rules

  • Claim workflow and timelines

  • Packaging / labeling spec sheet

  • Lead time and reorder calendar for your distributor stocking cycle



Common Heavy-Duty Starter Motor Returns & How B2B Distributors Prevent Them (Wholesale / Cross Reference / QC)

Most wholesale disputes come from a small set of repeatable issues. Fixing these improves margins more than negotiating a slightly lower unit price.


Top return reasons (and the prevention action)

Return Driver (B2B) What Happens Prevention for Wholesale Orders
Wrong rotation (CW/CCW) No start / grinding Require rotation confirmation on quote + label
Wrong teeth count Improper engagement Quote must include teeth count + pinion spec
Wrong mounting pattern Won’t fit Confirm flange/bolt pattern + photos if needed
Solenoid position mismatch Clearance issues Confirm solenoid clocking/position
Connector/terminal mismatch Wiring incompatibility Confirm connector type + terminal layout
Voltage mismatch (12V/24V) Failure/damage Require voltage confirmation on every SKU
kW/torque mismatch Weak starting Validate kW and intended application
Packaging damage Returns on arrival Export packing standard + drop-resistant carton
Interchange error Wrong SKU shipped Cross reference validation + internal SKU mapping
Warranty process confusion Dispute escalates Publish B2B warranty workflow and evidence list

The "lowest-return RFQ checklist" (copy into your buying SOP)

Ask the supplier to confirm on the proforma / quotation:

  • OE number(s)

  • Voltage, kW, teeth, rotation, mounting

  • Packaging method (inner box + carton + pallet)

  • Cross reference validation statement

  • Warranty workflow overview



Where Elecdurauto Fits in a B2B Wholesale Strategy (OE-Equivalent Replacement / Export Supply / Distributor Program)

Elecdurauto should be positioned clearly as an OE-equivalent (OE-grade) replacement supplier—not OEM and not "Genuine/original." That distinction matters for procurement expectations and marketing accuracy.


Best-fit buyers for Elecdurauto (B2B)

  • Importers building OE-equivalent replacement product lines

  • Wholesalers needing OE-number-based sourcing and stable batch supply

  • Distributors who want export-ready packaging and a repeatable reorder workflow

  • Buyers comparing USA-serving programs vs export supplier alternatives when MOQ/lead time doesn't match


How to integrate Elecdurauto into your shortlist (practical)

  1. Send a batch RFQ of 10–30 OE numbers

  2. Request: cross reference validation + MOQ tiers + lead time + packaging standard + warranty workflow

  3. Trial order on top movers → repeat order to validate consistency

  4. Scale into a distributor stocking program once return drivers are controlled


Internal link placements (so Part 2 converts)

Use these anchor patterns (you can link to your hub pages / category pages):

  • "OE-equivalent heavy-duty starter motor supplier" → (link: Elecdurauto starters category)

  • "Starter motor wholesale MOQ tiers & lead time" → (link: inquiry / RFQ page)

  • "Cross reference validation for bulk orders" → (link: your OE matching explanation page)

  • "Export packaging for distributors (neutral / private label)" → (link: packaging/QA page)



FAQ for Heavy-Duty Starter Motor Wholesale Buyers (Importer / Distributor / MOQ / Lead Time / OE-Equivalent Replacement)

1) Are you an OEM or do you sell genuine parts?

Elecdurauto supplies OE-equivalent (OE-grade) replacement parts for the aftermarket and wholesale distribution. We are not an OEM and do not position products as "Genuine/original."


2) What do you need to quote a heavy-duty starter motor bulk order?

For the fastest and safest quotation: OE number(s) + application + voltage + teeth + rotation + mounting and a quantity range, plus your destination port.


3) What is a typical MOQ for wholesale starter motors?

MOQ varies by supplier and SKU. The key is to confirm MOQ tiers, whether mixed models are allowed, and what price breaks apply for bulk orders.


4) How do distributors reduce wrong-fit returns?

By enforcing a quoting workflow: OE number → spec verification → cross reference confirmation, then locking the same mapping for reorders.


5) Can I request private label or neutral packaging for distributor supply?

Yes—B2B buyers typically request neutral boxes, barcode labels, or private label packaging. Confirm artwork rules, carton specs, and palletization requirements upfront.


6) Do you provide cross reference / interchange support?

For wholesale supply, you should request cross reference validation for each OE number and confirm the supplier's interchange method before scaling volume.


7) New vs reman: what's better for export wholesale?

Many importers prefer new units for simpler cross-border handling and fewer disputes, while reman programs can be attractive for certain channels if warranty/claim rules are strong.


8) How should starters be packed for export to reduce shipping damage?

Use anti-rust protection, internal cushioning, strong cartons, and pallet rules that prevent movement. Export packaging standards are critical for distributor programs.


9) What warranty terms are standard in B2B wholesale?

B2B warranties typically require evidence (labels, installation notes, test results, photos). Define the claim timeline and resolution process before the first bulk shipment.


10) How do I build a repeatable reorder program for distributors?

Start with trial orders for top movers, track return reasons, standardize the interchange map, then scale with a reorder calendar and stable packaging/QC rules.



Conclusion for B2B Importers & Wholesalers (OE-Equivalent Replacement / Supplier Shortlist / Bulk Order Conversion)

A "Top 20" list only outperforms competitors when it becomes a procurement tool. Use the RFQ template, scorecard, and return-prevention checklist to shortlist suppliers for MOQ fit, lead time stability, cross-reference accuracy, and export readiness.


If you want this article to drive inquiries, place Elecdurauto early (as an OE-equivalent replacement supplier) and add internal links where buyers naturally take action: RFQ, OE matching, packaging/QC, and distributor program pages.

Contact us

Ready To Start Your Project?

To Create A World-Class, Reliable, And Efficient Automotive Supply Chain, Providing Global Businesses With Seamless, Efficient, And Reliable Solutions.
Contact us
Heavy-Duty Parts. 
On Time. On Demand.
One-Stop Supplier in China
System
About
Contact Info
+86-189-1502-7366
A2 Block, Shimao Plaza, Changzhou, China
COPYRIGHT © 2025 ELECDURAUTO ALL RIGHTS RESERVED.