897209-1152 / MV2-40
OE-Equivalent Replacement Quality
IATF 16949 / ISO 9001 / CE / RoHS
50 pcs
7 - 15 Days
12 Months
| Availability: | |
|---|---|
| Quantity: | |
897209-1152 provides electrical fuel cutoff control for Hitachi EX4U, EX40U and EX55 excavators. A reliable replacement combines the complete OE with voltage, connector, bracket, output geometry and engine-side linkage. The application narrows the search, while the removed assembly remains the final dimensional and electrical reference.
Item | Confirmed Information |
Product Type | Fuel shutdown solenoid |
OE / Reference Numbers | 897209-1152 / MV2-40 |
Electrical Version | 12V and 24V versions; select by complete OE and old-unit marking |
Application Scope | Hitachi EX4U, EX40U and EX55 excavators |
MOQ | 50 pcs |
Delivery Time | 7 - 15 Days |
Warranty | 12 Months |
Match the complete stamped reference because voltage, winding, mounting, terminals, output geometry and duty can differ within the same family.
Matching Point | Buyer Review |
OE group | 897209-1152 / MV2-40 |
Voltage | 12V and 24V versions; select by complete OE and old-unit marking |
Application | Hitachi EX4U, EX40U and EX55 excavators |
Mounting | Measure hole centers, bracket angle and installed clearance. |
Output/connector | Compare rod or cable end, travel, terminals and plug orientation. |
Check the electrical command, component response and final mechanical movement as separate observations. This prevents a wiring, control-module or linkage fault from being mistaken for a failed replacement part.
Observed Situation | Recommended Check |
No movement | Check supply, ground, fuse, relay and connector voltage during command. |
Pulls then releases | Inspect the hold circuit and control state after cranking. |
Moves but no shutdown | Verify fuel-lever adjustment and complete mechanical travel. |
Intermittent operation | Inspect loose terminals, corrosion and heat-damaged wiring. |
New unit does not align | Stop installation and recheck bracket, output end and OE family. |
Release the order only after electrical, mechanical and application evidence agrees with the removed assembly.
Approval Item | Required Information |
OE and voltage | 897209-1152 / MV2-40; 12V and 24V versions; select by complete OE and old-unit marking |
Application | Hitachi EX4U, EX40U and EX55 excavators |
Removed-part photos | Complete label, connector face, both mounting sides and output end |
Measurements | Hole centers, body clearance, resting output length and working travel |
Commercial details | Quantity, destination market, packing and marking requirement |
Keep the complete voltage-specific reference and old-unit marking on every order line. Similar housings do not make different coils interchangeable. Measure system voltage at the original connector during operation, then label inventory by both OE and voltage so mixed fleets cannot receive the wrong electrical version.
Use 897209-1152 / MV2-40 as the first control, then compare the old label, voltage, connector face, mounting-hole centers, output end and operating direction. Record the engine or machine model and serial number, but do not use the model name alone because production changes can introduce another shutdown arrangement.
No. Application data narrows the candidate family, while the complete OE, voltage, bracket, connector and output geometry establish fitment. Production changes and previous repairs can place more than one shutdown arrangement in the same model range.
Measure voltage at the connector during the actual command, not only with the circuit unloaded. Check ground continuity, relay contacts, fuse condition and connector resistance. A normal open-circuit reading can collapse under load when terminals are corroded.
The output may not carry full travel to the fuel lever because of free play, wrong adjustment, bracket flex or a binding pivot. Observe the lever itself and verify that it reaches the mechanical stop before treating the electrical actuator as the only fault.
Compare the full label, voltage, connector face, terminal count, mounting-hole centers, body orientation, output end, resting length and working travel. Include one wider installed photo showing pump, lever or surrounding clearance because close product images can hide the geometry that decides fitment.
Correct the original failure cause before installation. Check supply voltage, pull/hold timing, linkage resistance, mechanical stops, terminal tightness, heat and moisture exposure. A new unit can fail quickly when the high-current stage remains energized or the output cannot complete its designed stroke.
Send the complete reference group, confirmed voltage, Hitachi EX4U, EX40U and EX55 excavators, removed-part photos, measurements and order quantity for a fitment-focused B2B quotation.