228000-212
228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND
Elecdura
Available for qualified orders
20 pcs
7 - 15 Days
Neutral packaging / private-label review
18 Months
228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND
3L applications
Confirm Confirm by OE/sample, Confirm by OE/sample, Confirm by OE/sample, Confirm by OE/sample rotation, mounting face, pinion and terminals.
| Availability: | |
|---|---|
| Quantity: | |
For distributors and fleet-parts buyers, 228000-212 identifies a Confirm by OE/sample, Confirm by OE/sample, Confirm by OE/sample-tooth clockwise configuration for 3L applications. Approve the complete reference, rating, drive end, mounting face, pinion and terminals against the removed unit or signed sample so a nearby version is not substituted into the purchasing line.
A reliable B2B listing for 228000-212 is more than a cross-reference lookup. The sourcing file should show how 228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND, 3L applications, the old unit and the supplied sample were reconciled. Keep photographs and inspection results with the buyer's internal item code, then require a fresh approval if any electrical or mechanical characteristic changes on a later production lot.
This video introduces Elecdura starter-motor production and supply capabilities. Use the product-specific specification, reference and fitment evidence on this page as the purchasing control for 228000-212.
Specification | Product specification and B2B ordering control |
Primary reference | 228000-212 |
OE / cross-reference group | 228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND |
Application scope | 3L applications |
System voltage | Confirm by OE/sample |
Rated power | Confirm by OE/sample |
Pinion teeth | Confirm by OE/sample |
Rotation | Confirm by OE/sample / Confirm by OE/sample |
Order verification | Confirm the complete 228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND group, the Confirm by OE/sample, Confirm by OE/sample, Confirm by OE/sample-tooth clockwise configuration and the stated application for 3L applications. Before volume supply, match equipment and engine record, complete OE, mounting face, pinion position and terminal arrangement against the removed unit or approved sample. |
228000-212 electrical gate | Approve 228000-212 only after the Confirm by OE/sample system and Confirm by OE/sample working rating agree with the removed unit. |
228000-212 drive gate | For 228000-212, compare the Confirm by OE/sample pinion, Confirm by OE/sample rotation, rest position and engagement depth. |
228000-212 mounting gate | Release 228000-212 only when the mounting face, locating diameter, bolt pattern and terminal clocking match the approved sample. |
228000-212 application gate | Keep 3L applications and the buyer's engine or machine record attached to the 228000-212 approval file. |
228000-212 lot gate | Link every 228000-212 receiving sample, carton label and inspection result to one supplier production lot. |
MOQ | 20 pcs, subject to final order confirmation |
Normal lead time | 7 - 15 days after order confirmation |
Warranty | 18 months under agreed sales terms |
Use 228000-212 as the primary purchasing reference and cross-check 28000-2120, 28100-05030, 28100-54270, 2-2989-ND. These numbers identify the candidate starter family, but approval still requires the exact suffix, electrical rating, drive end, mounting geometry, pinion and terminal layout to match the removed unit or signed sample.
Approval point | Order verification for 228000-212 |
Reference identity | Match the complete 228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND group and retain the old-unit label. |
Application record | 3L applications |
Electrical version | Confirm Confirm by OE/sample, Confirm by OE/sample, Confirm by OE/sample and Confirm by OE/sample rotation. |
Physical match | Compare equipment and engine record, complete OE, mounting face, pinion position and terminal arrangement. |
Commercial release | Link one approved sample, drawing or photo set to the quotation, purchase order and receiving lot. |
Fitment control for 228000-212 starts with the old starter and the application record. Compare equipment and engine record, complete OE, mounting face, pinion position and terminal arrangement, and do not force a unit into position with the mounting bolts. If the reference family includes multiple ratings or tooth counts, create separate approval and inventory records for each physical version.
Inspect incoming 228000-212 lots against the signed sample and purchase-line specification. Check reference label, electrical rating, drive end, mounting geometry, terminals, packing and lot traceability, record the result by lot and quarantine any mixed version before it reaches saleable inventory. This prevents a low-cost receiving shortcut from becoming an unverified substitute that can stop equipment, generate a claim and turn a low unit price into a costly order.
B2B item | Supply arrangement |
Quality position | Aftermarket replacement for verified reference and fitment |
MOQ | 20 pcs |
Lead time | 7 - 15 days, subject to order confirmation |
Packaging | Neutral packaging or private-label review for qualified orders |
Incoming control | Check reference label, electrical rating, drive end, mounting geometry, terminals, packing and lot traceability. |
Warranty | 18 months under agreed sales terms |
RFQ information | Complete OE, application record, old-unit photos, quantity and destination for 228000-212 |
Confirm the complete 228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND group together with the Confirm by OE/sample, Confirm by OE/sample, Confirm by OE/sample-tooth clockwise configuration. Similar appearance or a shared partial number is not enough; compare equipment and engine record, complete OE, mounting face, pinion position and terminal arrangement against the removed unit or approved sample and keep the signed sample with the purchase record.
Confirm the complete 228000-212 / 28000-2120 / 28100-05030 / 28100-54270 / 2-2989-ND group together with the Confirm by OE/sample, Confirm by OE/sample, Confirm by OE/sample-tooth clockwise configuration. Similar appearance or a shared partial number is not enough; compare equipment and engine record, complete OE, mounting face, pinion position and terminal arrangement against the removed unit or approved sample and keep the signed sample with the purchase record.
Compare the equipment and engine document, complete OE, mounting face, pinion position and terminal arrangement with the removed starter. Inspect bolt-hole spacing, locating diameter, starter clocking, pinion rest position and rear-terminal clearance instead of judging from the outer housing alone. Never pull a misaligned unit into place with mounting bolts. A measured or photographed fitment document is especially valuable when nearby references share the same voltage and tooth count but use another drive-end or solenoid orientation.
Tie every carton and sampled unit to 228000-212, the approved reference record and the supplier lot. Inspect reference label, electrical rating, drive end, mounting geometry, terminals, packing and lot traceability, then compare the sampled unit with the signed photos or dimensional record. Record pass and fail quantities before the stock is mixed. Quarantine any different rating, pinion, mounting face or terminal layout, because an unverified substitute can stop equipment, generate a claim and turn a low unit price into a costly order. This receiving discipline is cheaper than sorting returns after distribution.
A substitute is acceptable only when its complete reference relationship, Confirm by OE/sample system, Confirm by OE/sample rating, Confirm by OE/sample, rotation and mounting geometry agree with the approved unit. Similar appearance or a shared partial number is not enough. Ask for application and old-unit evidence, then test or approve a sample before changing the purchase line. Keep materially different versions separate in inventory so warehouse staff cannot fulfil one inquiry with the wrong variant.
Check battery capacity, voltage drop, start signal, grounds, ring gear and mechanical engine load prior to condemning the starter. Record battery voltage at rest and during the start command, then measure voltage drop under load; a weak supply or poor ground can imitate starter failure. Inspect the mounting surface and gear engagement as well. Attach these results, the old-unit label and failure symptoms to the claim so the supplier can distinguish a product defect from an upstream electrical or mechanical problem.
Send 228000-212 and all visible OE or catalog references, the full application or engine document, required quantity, destination and target delivery date. Add clear photos of the label, drive end, mounting face and terminals, plus any dimensional drawing available. State packaging, private-label, sample and inspection requirements at the start. A technically complete RFQ lets the supplier quote one verified configuration and reduces clarification delays after price approval.
The standard MOQ is 20 pieces, subject to final order confirmation, and a sample or pre-production approval should precede batch release when fitment evidence is incomplete. Mark the approved sample with 228000-212, procurement team application and revision date. Repeat orders should reference that same approval plus any packaging specification. If the supplier, suffix or physical design changes, treat it as a new approval rather than assuming the previous decision still applies.
Neutral packaging and private-label review are available for qualified orders. The carton and inner protection should prevent movement, terminal damage and contamination while keeping the product reference, lot identity and quantity readable. Private-label artwork must not remove the technical identifiers used for fitment and claims. Agree label content, barcode needs, carton strength and destination handling before production so the packaging supports both sales presentation and receiving control.
Send the complete reference, 3L applications, old-unit photos, quantity, destination and packaging or inspection requirements. Elecdura will use that evidence to review one defined aftermarket starter configuration for your quotation.