Denso-Type 24V 4.5kW 9T CW Variant A
Elecdura
Available for qualified orders
20 pcs
7 - 15 Days
Neutral packaging / private-label review
18 Months
Denso-type vehicle, tractor and industrial replacement programs
Confirm control-terminal layout, mounting face, pinion position, rotation and terminals against the removed unit or approved sample.
| Availability: | |
|---|---|
| Quantity: | |
The commercial value of Denso-Type 24V 4.5kW 9T CW Variant A depends on linking its available specification to a repeatable fitment record.
Denso-type vehicle, tractor and industrial replacement programs is the working supply scope. Confirm Denso-Type 24V 4.5kW 9T CW Variant A plus removed-unit photos and dimensions, control-terminal layout, mounting geometry, pinion position and terminal access before releasing distributor stock.
The video introduces Elecdura production, inspection and B2B supply capabilities; the product release remains governed by the specification and approval controls below.
Specification | B2B ordering control for Denso-Type 24V 4.5kW 9T CW Variant A |
Product identity | Denso-Type 24V 4.5kW 9T CW Variant A |
OE / reference control | Denso-Type 24V 4.5kW 9T CW Variant A plus removed-unit photos and dimensions |
Application scope | Denso-type vehicle, tractor and industrial replacement programs |
System voltage | 24V |
Rated power | 4.5kW |
Pinion | 9T |
Rotation | CW / clockwise |
Physical approval | Compare control-terminal layout, mounting pattern, drive-end depth, pinion position and terminal layout with the removed unit or signed sample. |
MOQ | 20 pcs, subject to final order confirmation |
Normal lead time | 7 - 15 days after order confirmation |
Warranty | 18 months under agreed sales terms |
Denso-Type 24V 4.5kW 9T CW Variant A is offered through configuration and sample matching. Because no public OE is assigned on this page, the buyer should use the removed starter, machine record, measurements and clear images as the order controls rather than treating a general type description as final fitment proof.
Approval point | Denso-Type 24V 4.5kW 9T CW Variant A distributor release record |
Identity check | Denso-Type 24V 4.5kW 9T CW Variant A plus removed-unit photos and dimensions |
Electrical review | 24V; 4.5kW; CW / clockwise |
Mechanical review | 9T; control-terminal layout; mounting face and terminal clocking |
Application link | Denso-type vehicle, tractor and industrial replacement programs |
Release evidence | first-article inspection report |
Release fitment only when electrical rating, rotation, pinion, mounting face and control-terminal layout agree with the removed unit. Record the decision in a first-article inspection report so future replenishment does not depend on memory or a cropped photograph.
At receiving, confirm outer-carton identity, sampled labels, mounting surfaces, pinion protection, terminal security and control-terminal layout. Keep lot photographs and dimensional results with the purchase record so claims can be traced quickly.
Elecdura supports a 20-piece MOQ, normal 7 - 15 day lead time and 18-month warranty under agreed terms for Denso-Type 24V 4.5kW 9T CW Variant A. Neutral packaging is standard; private-label review is available for qualified orders after the product configuration and artwork are approved.
B2B item | Supply arrangement for Denso-Type 24V 4.5kW 9T CW Variant A |
Order position | Aftermarket replacement supplied against an approved configuration |
MOQ | 20 pcs |
Lead time | 7 - 15 days, subject to order confirmation |
Packaging | Neutral packaging or private-label review for qualified orders |
Receiving control | Check carton identity, control-terminal layout, pinion protection, terminals and sampled dimensions. |
Warranty | 18 months under agreed sales terms |
RFQ pack | Quantity, destination, application record, old-unit photos and first-article inspection report |
Treat the purchase record as a fitment-control document, not only a price request. Confirm Denso-Type 24V 4.5kW 9T CW Variant A plus removed-unit photos and dimensions, then compare 24V system voltage, 4.5kW rated output, 9T pinion, CW / clockwise with the removed starter. Finish the approval with control-terminal layout, the mounting pattern and terminal accessibility. Keep the result with the purchase order so diesel workshop buyers can repeat the same approval at replenishment.
A repeatable approval process begins with the complete electrical and mechanical record. Verify nominal voltage from the machine record and starter label, then review rated output, cable size, battery condition and the control-terminal arrangement. Do not assume that a housing with a similar outline uses the same electrical package or cranking requirement. That record gives diesel workshop buyers a practical way to separate visually similar units before warehouse release.
The safest wholesale decision links product identity, physical geometry and the application record. Count the teeth, measure the available outside diameter and compare the pinion's rest and engaged positions with the old unit. A tooth-count match alone does not confirm ring-gear engagement, drive travel, nose clearance or the correct direction of operation. The signed result should remain linked to the quotation, sample and receiving lot for traceability.
Before stock is released, the quotation and inspection record should describe the same configuration. Provide the number of mounting holes, center distances, register diameter, drive-end depth and usable clearance around the solenoid and terminals. Add square-on photographs from the flange, pinion and terminal sides so production can review control-terminal layout before sample release. A controlled comparison protects both the buyer's installation schedule and the supplier's production release.
Use the removed assembly or signed sample as the common reference for sales, production and receiving. A photo is useful for screening, but it should be combined with the complete label, application or machine record, electrical rating and physical measurements. When an external reference is unavailable, use first-article inspection report and approve one sample before committing distributor inventory. This discipline helps diesel workshop buyers keep private-label lots traceable without relying on a partial label match.
For a volume order, every department should work from one controlled configuration file. Check the label, overall workmanship, free pinion movement, mounting surfaces, terminal security and rotation under the agreed test condition. Compare the sample with the signed record for control-terminal layout, then retain the approved result as the standard for the production and receiving teams. Keep the result with the purchase order so diesel workshop buyers can repeat the same approval at replenishment.
Start with the buyer's original unit rather than a shortened description. Link the carton label to the purchase order and approved configuration, then sample-check external damage, mounting face, pinion, terminal protection and key dimensions. Record lot details and photographs before items enter saleable stock so later claims can be traced to a defined shipment. That record gives diesel workshop buyers a practical way to separate visually similar units before warehouse release.
Treat the purchase record as a fitment-control document, not only a price request. Send required quantity, destination, packaging preference, expected order timing and the technical approval pack. Include old-unit images and equipment details when available, and identify any private-label or barcode requirement early so commercial and production reviews follow the same scope. The signed result should remain linked to the quotation, sample and receiving lot for traceability.
A repeatable approval process begins with the complete electrical and mechanical record. Neutral packaging is standard for qualified orders, while private-label review depends on quantity and artwork approval. Warranty follows the agreed sales terms; preserve installation findings, battery and cable checks, failed-unit images and lot identification so any claim can be evaluated against the approved configuration. A controlled comparison protects both the buyer's installation schedule and the supplier's production release.
For a quotation, send quantity, destination, target order date, packaging requirements and the application or equipment record for Denso-Type 24V 4.5kW 9T CW Variant A. Add old-unit photographs and first-article inspection report; this lets the sales and technical teams review the same scope before sample or volume release.