KDRDE5K-31/40E30-116A-T
KDRDE5K-31/40E30-116A / 225-4558
OE-Equivalent Replacement Quality
IATF 16949 / ISO 9001 / CE / RoHS
50 pcs
7 - 15 Days
12 Months
KDRDE5K-31/40E30-116A / 225-4558
Caterpillar equipment using the matching Kawasaki pump control valve construction
Confirm 12v, connector, flange mounted kawasaki cartridge, seals and hydraulic circuit before installation.
| Availability: | |
|---|---|
| Quantity: | |
KDRDE5K-31/40E30-116A-T is a 12V hydraulic pump solenoid valve for Caterpillar equipment using the matching Kawasaki pump control valve construction. Buyers should confirm the complete old marking, electrical version, connector, flange mounted kawasaki cartridge and hydraulic function before approving replacement stock.
Specification | Value |
|---|---|
Product Type | Hydraulic Pump Solenoid Valve |
Primary Reference | KDRDE5K-31/40E30-116A-T |
Cross References | KDRDE5K-31/40E30-116A / 225-4558 |
Electrical Version | 12V |
Working Pressure Reference | 41 bar |
Interface | Flange mounted Kawasaki cartridge |
Application Scope | Caterpillar equipment using the matching Kawasaki pump control valve construction |
MOQ | 50 pcs |
Delivery Time | 7 to 15 Days |
Warranty | 12 Months |
Use the original catalog dimensional reference and hydraulic symbol to compare the valve with the removed component and the machine schematic before purchase approval.
Complete every control point below before a sample or bulk order is released.
Approval Point | Buyer Review |
|---|---|
Reference | KDRDE5K-31/40E30-116A / 225-4558 |
Electrical | 12V; verify at the loaded connector during the actual command |
Mechanical | Compare flange mounted kawasaki cartridge, cartridge length, seals and installed clearance |
Hydraulic | Confirm normal state, energized state and manifold port relationship |
Machine Evidence | Caterpillar equipment using the matching Kawasaki pump control valve construction |
Separate electrical command, cartridge movement and machine response so the actual wiring or hydraulic fault is not hidden by a parts replacement.
Observed Condition | Recommended Check |
|---|---|
No movement | Check loaded connector voltage, ground, controller command and coil resistance. |
Slow response | Inspect oil cleanliness, filter condition, viscosity and cartridge movement. |
Reversed response | Stop operation and compare normal and energized port logic with the original valve. |
External leakage | Inspect seals, cartridge surface, manifold bore and correct seating depth. |
Repeated heating | Confirm voltage, duty cycle, connector resistance and full magnetic movement. |
During a machine serial range cannot be confirmed, keep the verified reference, measurements and test result in the service record. Approve KDRDE5K-31/40E30-116A-T from the complete old valve marking, 12v electrical version, connector keying, flange mounted kawasaki cartridge, sealing lands and normal hydraulic state. A shared equipment model does not prove interchangeability because pump and manifold revisions can change during production. Send the machine model, serial number and clear removed part photos with the inquiry.
During fleet stock is replenished for planned service, keep the verified reference, measurements and test result in the service record. Read the coil label first and measure voltage at the connector while the real machine command is active. The working reference for this page is 12V. Do not infer voltage only from battery count because converters, harness changes and mixed voltage fleets can create misleading assumptions. Record the verified value on the purchase order and incoming inspection label.
During an incoming production lot is released, keep the verified reference, measurements and test result in the service record. Provide the complete old label, machine model and serial number, confirmed voltage, connector face photo, cartridge or flange measurements, hydraulic function, required quantity and destination. For mixed fleets, separate each electrical and suffix version on the inquiry. This evidence allows a sample approval plan and prevents similar looking hydraulic pump solenoid valve variants from being combined in one bulk order.
During a cross border quotation needs technical approval, keep the verified reference, measurements and test result in the service record. Verify commanded voltage under load, coil duty cycle, connector resistance and whether the hydraulic element reaches its intended position. Low voltage can prevent full magnetic pull, while excessive voltage or continuous energization can overheat the winding. Contamination that restricts cartridge movement can also increase operating stress, so correct the electrical or hydraulic root cause before fitting another coil.
During a controller output fault is suspected, keep the verified reference, measurements and test result in the service record. Check the printed reference and voltage against the purchase order, then sample connector keying, overall length, mounting interface, seal count and coil resistance. Keep voltage or suffix variants physically separated and traceable. For the first production lot, compare one unit with the approved old component before releasing the remaining quantity to warehouse stock or field service.
During cold start commissioning is completed, keep the verified reference, measurements and test result in the service record. Compare the connector face, key position, pin count, latch direction and cable exit with the removed component. Also check whether suppression is built into the coil because this can affect controller diagnostics. Photograph the connector straight on beside a ruler and include the terminal condition in the RFQ, especially when several Caterpillar harness revisions are used in the same fleet.
During a workshop compares two connector orientations, keep the verified reference, measurements and test result in the service record. Reuse is not recommended when the service procedure specifies new seals or the old rings show flattening, cuts or heat damage. Confirm material compatibility with the hydraulic oil, clean the flange mounted kawasaki cartridge and inspect the manifold bore for scoring. Lubricate and install seals without twisting, then follow the equipment torque procedure instead of forcing the cartridge past resistance.
Send the complete old valve marking, confirmed voltage, machine model and serial number, connector photos, interface dimensions and required quantity for a fitment focused B2B quotation.