KDRDE5KR-20/40C07-203A-T
KDRDE5KR-20/40C07-203A / V0009277998
OE-Equivalent Replacement Quality
IATF 16949 / ISO 9001 / CE / RoHS
50 pcs
7 - 15 Days
12 Months
KDRDE5KR-20/40C07-203A / V0009277998
Kobelco excavator hydraulic pump control using the exact 40C07-203A model
Confirm 24v, connector, threaded cartridge with lead connector, seals and hydraulic circuit before installation.
| Availability: | |
|---|---|
| Quantity: | |
KDRDE5KR-20/40C07-203A-T is a 24V hydraulic pump solenoid valve for Kobelco excavator hydraulic pump control using the exact 40C07-203A model. Buyers should confirm the complete old marking, electrical version, connector, threaded cartridge with lead connector and hydraulic function before approving replacement stock.
Specification | Value |
|---|---|
Product Type | Hydraulic Pump Solenoid Valve |
Primary Reference | KDRDE5KR-20/40C07-203A-T |
Cross References | KDRDE5KR-20/40C07-203A / V0009277998 |
Electrical Version | 24V |
Working Pressure Reference | 41 bar |
Interface | Threaded cartridge with lead connector |
Application Scope | Kobelco excavator hydraulic pump control using the exact 40C07-203A model |
MOQ | 50 pcs |
Delivery Time | 7 to 15 Days |
Warranty | 12 Months |
Use the original catalog dimensional reference and hydraulic symbol to compare the valve with the removed component and the machine schematic before purchase approval.
Complete every control point below before a sample or bulk order is released.
Approval Point | Buyer Review |
|---|---|
Reference | KDRDE5KR-20/40C07-203A / V0009277998 |
Electrical | 24V; verify at the loaded connector during the actual command |
Mechanical | Compare threaded cartridge with lead connector, cartridge length, seals and installed clearance |
Hydraulic | Confirm normal state, energized state and manifold port relationship |
Machine Evidence | Kobelco excavator hydraulic pump control using the exact 40C07-203A model |
Separate electrical command, cartridge movement and machine response so the actual wiring or hydraulic fault is not hidden by a parts replacement.
Observed Condition | Recommended Check |
|---|---|
No movement | Check loaded connector voltage, ground, controller command and coil resistance. |
Slow response | Inspect oil cleanliness, filter condition, viscosity and cartridge movement. |
Reversed response | Stop operation and compare normal and energized port logic with the original valve. |
External leakage | Inspect seals, cartridge surface, manifold bore and correct seating depth. |
Repeated heating | Confirm voltage, duty cycle, connector resistance and full magnetic movement. |
During a customer reports reversed machine response, keep the verified reference, measurements and test result in the service record. Approve KDRDE5KR-20/40C07-203A-T from the complete old valve marking, 24v electrical version, connector keying, threaded cartridge with lead connector, sealing lands and normal hydraulic state. A shared equipment model does not prove interchangeability because pump and manifold revisions can change during production. Send the machine model, serial number and clear removed part photos with the inquiry.
During a connector harness revision is compared, keep the verified reference, measurements and test result in the service record. The 41 bar figure is a catalog or verified product reference, not permission to ignore the equipment hydraulic schematic. Confirm which ports see pressure in both de-energized and energized states, review return line conditions and follow the machine service limits. Pressure capability does not correct a wrong spool function, cartridge depth or manifold port relationship.
During a replacement warranty claim is reviewed, keep the verified reference, measurements and test result in the service record. Two valves can share a coil diameter and connector yet use different cartridge lengths, metering notches, spring forces or port logic. In Kobelco service, compare the full reference, manifold bore, installed depth, connector direction and hydraulic symbol. A valve that screws in but routes pressure differently can create weak response, reversed motion or continuous pump loading.
During a new supplier lot enters dimensional inspection, keep the verified reference, measurements and test result in the service record. Use the drawing to compare overall length, thread or flange position, sealing diameters and connector clearance with the removed component. Read the spring side of the hydraulic symbol as the normal state and the solenoid side as the energized state. Port letters are catalog identifiers and must be reconciled with the equipment schematic before commissioning.
During a seal leakage complaint is assessed, keep the verified reference, measurements and test result in the service record. Serial number evidence is essential whenever the same equipment family used more than one pump, manifold or electrical harness. Use it with the parts diagram rather than as a substitute for physical checks. If the old valve label is damaged, collect connector, mounting, cartridge and installed location photos so the application can be narrowed without guessing from the machine name alone.
During a hydraulic schematic differs from the catalog port letters, keep the verified reference, measurements and test result in the service record. Compare the connector face, key position, pin count, latch direction and cable exit with the removed component. Also check whether suppression is built into the coil because this can affect controller diagnostics. Photograph the connector straight on beside a ruler and include the terminal condition in the RFQ, especially when several Kobelco harness revisions are used in the same fleet.
During a mixed voltage shipment reaches receiving inspection, keep the verified reference, measurements and test result in the service record. The spring side of the circuit symbol defines what the machine does when electrical power is absent. That state can hold, unload, block or route pilot pressure, and the wrong choice may create movement or pump load at startup. Compare the original schematic with the catalog symbol and verify the safe normal condition before energizing the replacement in the machine.
Send the complete old valve marking, confirmed voltage, machine model and serial number, connector photos, interface dimensions and required quantity for a fitment focused B2B quotation.