5002253
5002253
OE-Equivalent Replacement Quality
IATF 16949 / ISO 9001 / CE / RoHS
50 pcs
7 - 15 Days
12 Months
5002253
Hydraulic cartridge manifolds using reference 5002253 with the matching coil and connector
Confirm 12v, connector, 5/8-18 unf-2a, seals and hydraulic circuit before installation.
| Availability: | |
|---|---|
| Quantity: | |
5002253 is a 12V two position three way hydraulic solenoid valve for Hydraulic cartridge manifolds using reference 5002253 with the matching coil and connector. Buyers should confirm the complete old marking, electrical version, connector, 5/8-18 unf-2a and hydraulic function before approving replacement stock.
Specification | Value |
|---|---|
Product Type | Two Position Three Way Hydraulic Solenoid Valve |
Primary Reference | 5002253 |
Cross References | 5002253 |
Electrical Version | 12V |
Working Pressure Reference | Confirm from machine data |
Interface | 5/8-18 UNF-2A |
Application Scope | Hydraulic cartridge manifolds using reference 5002253 with the matching coil and connector |
MOQ | 50 pcs |
Delivery Time | 7 to 15 Days |
Warranty | 12 Months |
Use the original catalog dimensional reference and hydraulic symbol to compare the valve with the removed component and the machine schematic before purchase approval.
Complete every control point below before a sample or bulk order is released.
Approval Point | Buyer Review |
|---|---|
Reference | 5002253 |
Electrical | 12V; verify at the loaded connector during the actual command |
Mechanical | Compare 5/8-18 unf-2a, cartridge length, seals and installed clearance |
Hydraulic | Confirm normal state, energized state and manifold port relationship |
Machine Evidence | Hydraulic cartridge manifolds using reference 5002253 with the matching coil and connector |
Separate electrical command, cartridge movement and machine response so the actual wiring or hydraulic fault is not hidden by a parts replacement.
Observed Condition | Recommended Check |
|---|---|
No movement | Check loaded connector voltage, ground, controller command and coil resistance. |
Slow response | Inspect oil cleanliness, filter condition, viscosity and cartridge movement. |
Reversed response | Stop operation and compare normal and energized port logic with the original valve. |
External leakage | Inspect seals, cartridge surface, manifold bore and correct seating depth. |
Repeated heating | Confirm voltage, duty cycle, connector resistance and full magnetic movement. |
During a replacement warranty claim is reviewed, keep the verified reference, measurements and test result in the service record. Approve 5002253 from the complete old valve marking, 12v electrical version, connector keying, 5/8-18 unf-2a, sealing lands and normal hydraulic state. A shared equipment model does not prove interchangeability because pump and manifold revisions can change during production. Send the machine model, serial number and clear removed part photos with the inquiry.
During a maintenance planner builds critical spare stock, keep the verified reference, measurements and test result in the service record. Read the coil label first and measure voltage at the connector while the real machine command is active. The working reference for this page is 12V. Do not infer voltage only from battery count because converters, harness changes and mixed voltage fleets can create misleading assumptions. Record the verified value on the purchase order and incoming inspection label.
During a coil replacement is considered without changing the cartridge, keep the verified reference, measurements and test result in the service record. The Confirm from machine data figure is a catalog or verified product reference, not permission to ignore the equipment hydraulic schematic. Confirm which ports see pressure in both de-energized and energized states, review return line conditions and follow the machine service limits. Pressure capability does not correct a wrong spool function, cartridge depth or manifold port relationship.
During a pilot passage blockage is investigated, keep the verified reference, measurements and test result in the service record. Provide the complete old label, machine model and serial number, confirmed voltage, connector face photo, cartridge or flange measurements, hydraulic function, required quantity and destination. For mixed fleets, separate each electrical and suffix version on the inquiry. This evidence allows a sample approval plan and prevents similar looking two position three way hydraulic solenoid valve variants from being combined in one bulk order.
During a repeat coil heating case is investigated, keep the verified reference, measurements and test result in the service record. Check the printed reference and voltage against the purchase order, then sample connector keying, overall length, mounting interface, seal count and coil resistance. Keep voltage or suffix variants physically separated and traceable. For the first production lot, compare one unit with the approved old component before releasing the remaining quantity to warehouse stock or field service.
During a seal leakage complaint is assessed, keep the verified reference, measurements and test result in the service record. The spring side of the circuit symbol defines what the machine does when electrical power is absent. That state can hold, unload, block or route pilot pressure, and the wrong choice may create movement or pump load at startup. Compare the original schematic with the catalog symbol and verify the safe normal condition before energizing the replacement in the machine.
During an emergency field repair is evaluated, keep the verified reference, measurements and test result in the service record. Measure voltage across the coil while the controller commands the valve, then measure the positive and ground side drops separately. A static open circuit reading can look normal while a corroded terminal collapses under load. Compare the result with the confirmed 12v requirement and repair excessive resistance before judging the two position three way hydraulic solenoid valve itself as defective.
Send the complete old valve marking, confirmed voltage, machine model and serial number, connector photos, interface dimensions and required quantity for a fitment focused B2B quotation.