XY19582
XY19582
OE-Equivalent Replacement Quality
IATF 16949 / ISO 9001 / CE / RoHS
50 pcs
7 - 15 Days
12 Months
XY19582
Automotive hydraulic valve service using the XY19582 marking, Deutsch connector and matching coil bore
Confirm 12v, 30w, deutsch connector, coil bore and retaining method before installation.
| Availability: | |
|---|---|
| Quantity: | |
XY19582 is a automotive hydraulic solenoid coil for Automotive hydraulic valve service using the XY19582 marking, Deutsch connector and matching coil bore. Buyers should confirm the full reference, 12v, deutsch connector, coil bore and body construction before approving replacement stock.
Specification | Confirmed Information |
|---|---|
Product Type | Automotive Hydraulic Solenoid Coil |
Primary Reference | XY19582 |
Cross References | XY19582 |
Voltage | 12V |
Power | 30W |
Connector | Deutsch connector |
Insulation Class | H |
Application Scope | Automotive hydraulic valve service using the XY19582 marking, Deutsch connector and matching coil bore |
MOQ | 50 pcs |
Delivery Time | 7 to 15 Days |
Warranty | 12 Months |
Complete every control point below before a sample or bulk order is released.
Approval Point | Buyer Review |
|---|---|
Reference | XY19582 |
Electrical | 12V; 30W; verify under load |
Connector | Deutsch connector |
Mechanical | Compare bore, height, body shape and retaining method |
Machine Evidence | Automotive hydraulic valve service using the XY19582 marking, Deutsch connector and matching coil bore |
Separate electrical command, component movement and final machine response so the actual wiring or hydraulic fault is not hidden by parts replacement.
Observed Condition | Recommended Check |
|---|---|
No magnetic pull | Check loaded voltage, ground, continuity and coil resistance. |
Intermittent operation | Inspect terminal retention, lead damage and heat-related winding faults. |
Excessive heating | Confirm voltage, wattage, duty cycle and free valve-stem movement. |
Connector damage | Inspect keying, seals, corrosion and harness side loading. |
Correct coil, no hydraulic response | Inspect the armature, spool, oil cleanliness and machine command. |
When a mixed-voltage shipment reaches receiving inspection, keep the verified measurements and test result in the service record. Approve the complete old marking, 12v rating, 30w power reference, deutsch connector, coil bore, body height and retaining method. A matching voltage alone does not prove fit. Send straight-on connector, top-bore and side-profile photographs with measurements so the replacement is selected from electrical and mechanical evidence.
When contamination is found in the circuit, keep the verified measurements and test result in the service record. Measure voltage directly across the energized coil while the machine issues the real hydraulic command. An unloaded harness reading can hide resistance at a corroded terminal, relay or ground path. Compare the loaded result with 12v, record polarity where suppression is present and correct the circuit before blaming a new coil for weak magnetic pull.
When a sample moves into volume production, keep the verified measurements and test result in the service record. Power affects current draw, heat generation and available magnetic force. A replacement with another wattage may fit the valve stem yet operate too weakly, run hotter or exceed a controller output. Confirm 30w from the old label or approved specification, then compare warm current and temperature during sample testing before releasing a bulk order.
When a hydraulic schematic uses different port labels, keep the verified measurements and test result in the service record. Compare pin count, key position, latch direction, cable exit, terminal size and seal arrangement. Similar coil bodies may use a Deutsch, Weatherpack, insert or lead-wire connection that is not electrically or mechanically interchangeable. Photograph the connector face beside a ruler and note any diode or polarity marking before purchasing or adapting the harness.
When a valve body was replaced during an earlier repair, keep the verified measurements and test result in the service record. Match the carton and coil labels to the purchase order, measure sample resistance, inspect connector keying and verify bore and height. Keep 12V, 24V and unusual voltage stock in separate labeled locations. A visual check alone is insufficient because several voltage versions can share the same molded body and connector.
When a machine returns after long storage, keep the verified measurements and test result in the service record. No. The coil produces magnetic force but the armature and hydraulic element must move freely. Inspect the stem for corrosion, contamination, impact damage and correct retaining hardware. If the valve remains stuck, a new coil may heat or appear weak even when its electrical condition is normal, leading to repeated unnecessary replacement.
When cold-start commissioning is completed, keep the verified measurements and test result in the service record. Insulation class is one indicator of winding temperature capability, but it does not authorize overvoltage, blocked armature operation or continuous duty beyond the product design. Keep the catalogued class with voltage and wattage records. During sample testing, confirm actual stabilized temperature under the intended command cycle and installation environment.
Send the complete old marking or component evidence, confirmed voltage, machine information, clear photos, measurements and required quantity for a fitment-focused B2B quotation.